Green Iron Investment Fund
$200M is available to scale green iron production in Australia. Must be Australian-based to apply.
$200M is available to scale green iron production in Australia. Must be Australian-based to apply.
If you’re working in green iron, steel decarbonisation, or large-scale downstream processing — this fund could accelerate your project. Up to $200 million is available for projects that reduce reliance on traditional blast furnaces, cut emissions, and build Australia’s role in the global green steel supply chain.
The Green Iron Investment Fund – National Development Stream is a $200 million program run by the Australian Government.
It backs projects that move Australia beyond raw iron ore exports and into green iron production — a critical step for global decarbonisation.
Why? Because steelmaking is one of the world’s biggest carbon emitters. If Australia can prove commercial-scale alternatives, it cements its role as a clean energy superpower.
This is the first funding round, with grants supporting pilot and large-scale green iron projects.
The program targets:
Applicants must be Australian-based and able to demonstrate scale, partnerships, and funding leverage.
Funding covers projects that:
Not eligible: research-only projects, very early-stage concepts, or business-as-usual upgrades that don’t transform emissions.
Here’s the deal: strong applications read like construction is about to start. Clear plan, numbers that reconcile, evidence ready. Use the three headings the assessors score against, but don’t write like a brochure—write like a project manager who’s across the detail.
Open with one crisp paragraph that says what you’re building, where it sits, and the emissions it will remove. Name the pathway plainly—hydrogen DRI, electrified smelting, or your credible low-emissions route—and link it to Future Made in Australia, the National Hydrogen Strategy, and green-metals priorities using the program’s language.
Then attach the proof the panel expects: letters of support (state/council/utilities/
Lead with the money. Total capex (ex-GST), grant ask, your cash, and the leverage ratio at the top. Follow with throughput and impact—tonnes of green iron per year, $/t at steady state, and tCO₂e avoided per tonne against a blast-furnace baseline. If you’re export-facing, say where it goes (Asia/EU), at what indicative price, and the status of offtake (signed or in-principle). Jobs matter: construction job-years and ongoing FTEs, plus any local supply-chain uplift.
In the form, keep the tables tight: split eligible vs ineligible capex, lock a commissioning date inside the window, and make sure benefits copy matches the model. The numbers must reconcile—scope → QS → CBA. If they don’t, you’ll bleed points.
Back it with evidence: an independent QS (escalation and contingency tied to drawings), a CBA showing NPV/IRR/payback with two sensible sensitivities (e.g., ±hydrogen cost, ±steel price), offtake letters or market reports, and a workforce plan with method, not guesses.
This is where you make the Commonwealth feel comfortable. Call out the three big risks—technology performance, approvals/tenure, and cost/schedule—and show how each is contained. Outline the delivery model (EPC/EPCM), who holds what risk, how you’ll procure, and when. A believable program matters more than an optimistic one: a Gantt with milestones, critical path, long-lead items flagged, and a commissioning date that lines up with funding and offtake.
What to upload: a risk register with owners and actions, a procurement/contract strategy (e.g., fixed-price after 30% design), governance chart with key CVs and decision rights, plus your environmental and cultural heritage evidence. If it isn’t evidenced, it isn’t de-risked.
Eligible just means you can lodge the form.
Competitive means you look like an A+ applicant with an A+ project. That’s the bar.
We know what that looks like because we’ve written hundreds. The difference is in the detail: no waffle, no generic promises — just tight writing against the merit criteria, numbers that reconcile, approvals with dates, funding evidenced, and demand locked.
Got a “B-grade” project? We can often frame it so it looks like an A — but that only works if the fundamentals are real. Weak alignment or vague funding won’t fly.
At Bulletpoint, we only back projects we rate 80%+ competitive. We either show you how to pitch it properly, or we tell you straight it’s not worth your time. That’s the choice: do you want to roll the dice with an internal writer, or go up against people who do this for a living?
And if you’re still reading — you’re already competing with us.
We’ve gone through the government’s green-metals policy line-by-line and mapped it to what’s actually moving on the ground. The Green Iron Investment Fund is built to back early-mover, scalable, low-emissions ironmaking that builds local supply chains—not science projects. It sits inside Future Made in Australia with a $1 billion envelope, including a significant Whyalla allocation but > $500 million for projects nationally. Prime Minister of Australia+3Industry.gov.au+3In
Here’s the shortlist of project types we expect to compete hardest in Round 1. If your concept looks like one of these—and you can evidence it—we should talk.
Our take: the winners won’t be the shiniest decks—they’ll be the projects that can show bankable energy inputs, credible offtake, QS-tight costs, approvals in train, and commissioning inside the window. The government has been clear: this fund is to bridge the first-of-kind capital gap and create real supply chains here, not subsidise business-as-usual. Industry.gov.au+1
If your project genuinely maps to one of these—and you can prove it on paper—we’ll give you a blunt competitiveness read. If it’s 80%+, we’ll back it. If it’s not, we’ll tell you what to fix before you burn months on a long shot.
You probably already know what’s coming. Your job now is to herd the cats — finance won’t send numbers until the last minute, the approvals letter will get lost in someone’s inbox, and you’ll end up pulling it all together at midnight with a strong coffee and a weak smile.
That’s the reality of these applications. They’re always written at the last minute, with everyone promising “we’ll get you that by Friday” and you chasing like a sheepdog. If only there was a way to make it all go away — to have a running start, to know exactly which sections matter, and to avoid wasting nights wordsmithing “strategic alignment” until your eyes blur.
Here’s the thing: we know what you’re in for. We’ve lived it. And we also know how to short-circuit the pain. While you’re bracing for an all-nighter, we’re the ones who’ve already drafted, locked the evidence, and submitted a day early. We even leave in the odd spelling mistake on purpose — because this isn’t an English essay, it’s a grant application. You don’t win by hyphenating perfectly; you win by proving delivery.
So ask yourself — do you want to be the person in the boardroom at 11pm arguing over commas, or the one who handed it in already and is getting some sleep?
We only take on one client per round. One shot, one application, full focus. Will it be you — or the “other guy” she told you not to worry about?
We’ll be sitting by the phone.