If you’re applying for the Grid Enhancing Technologies Grant, the hardest part isn’t eligibility — it’s writing an application that actually scores well.
Most applicants fall short not because their tech isn’t good, but because they fail to prove the impact.
This guide breaks down exactly what the assessors want to see — with examples, scoring tips, and real-world phrasing that works.
The Grid Enhancing Technologies (GET) Grant is a federal funding program designed to help more renewable energy flow through Australia’s existing electricity network — without building new poles and wires.
Instead of greenfield upgrades, this grant supports technologies that make smarter use of current infrastructure. That means improving visibility, forecasting, control, and capacity across substations, feeder lines, and transmission corridors.
The program is managed by the Department of Climate Change, Energy, the Environment and Water, with up to $5 million available per project.
It’s one of the few grant programs that’s laser-focused on making the grid work better, not bigger — and that makes it a unique opportunity for software, sensing, control, and grid-edge innovators.
This grant is designed for Australian businesses working on technologies that improve how the electricity grid performs — not just in theory, but in real-world deployments.
The ideal applicant is a company with a clear product or solution that enhances grid efficiency, visibility, or flexibility — and can be deployed within the project timeframe.
Applicants must be:
Note for research organisations: You can participate as a partner — but the lead applicant must be an industry-based entity.
Not sure if your tech qualifies? Here are some real-world examples of what the GET Grant is designed to support. These are based on the official guidelines — but tailored to what assessors are actually looking for.
If your solution helps squeeze more capacity out of the existing grid — and can be deployed within 2 years — it’s likely eligible.
Having a good product or promising technology isn’t enough to win this grant. What separates the successful applicants is their ability to clearly link their solution to measurable, grid-level outcomes.
Here’s where most submissions fall short:
This grant is assessed using a formal scorecard — not just a yes/no checklist. To be competitive, your application needs to address all three criteria with clear, measurable evidence.
Here’s the breakdown:
Most applicants score well in one or two — but to win, you need to hit all three. The next sections break down exactly how to do that.
This is the most heavily weighted section — and the one where most applicants lose points.
The key question assessors are asking is:
“If we give you $5 million, what’s the actual return for the grid?”
You need to break this into two parts: measurable benefit + clear need for funding.
This is where you prove your tech makes the grid work better — not bigger. Focus on outcomes for the network, not just your product features.
Now quantify it:
These kinds of numbers show that your project isn’t just interesting — it’s useful to the system. Pull from modelling data, previous deployments, or pilot results if you have them.
This is about additionality. The assessors need to believe that funding is unlocking something — not just subsidising what you already planned to do.
A bad answer: “We’re doing the project anyway, but this will help.”
A good answer:
“Without grant funding, we would likely pilot this at a single rural site, without the full sensor suite or modelling support. The grant allows us to scale across four zones and fast-track implementation by 18 months.”
Even if you’d do something without the grant, show that:
That makes the case for why public funding is delivering real public value.
It’s one thing to have a good idea — it’s another to execute it. This criterion tests whether your team, partners, and infrastructure access give the project a real shot at success.
Assessors want to see that you’re not guessing. You should have agreements, equipment, data rights, and test environments ready (or close).
Example:
“We have an in-principle agreement from AusNet to test this across three substations in the Latrobe Valley. The project will use our existing network modelling platform and sensor data from previous deployments.”
Show that the people involved have done this before — or something close. Don’t just say they’re experienced. Name them, list projects, and explain what they’ll do.
Example:
“Our CTO led the SA Power Networks demand-response pilot with ARENA. Our lead engineer previously delivered grid visualisation systems for Energy Queensland.”
This is your chance to show you’ve thought through the weak points. List the top risks — and what you’re doing to address them.
Mitigation example:
“We’re embedding security by design using AESCSF controls and will conduct third-party penetration testing before live rollout.”
Show that you’ve done the hard thinking. It gives assessors confidence you’ll actually deliver.
This criterion is all about scale and sector impact. The assessors want to fund projects that don’t just sit in a pilot report — they want ideas that will change how the grid operates across Australia.
Explain what this project will teach us. That could be network performance before and after, cost-per-MW of congestion relief, load predictability, DER control outcomes — whatever’s relevant.
Example:
“We’ll evaluate pre/post voltage quality, congestion duration, and DER contribution to peak load. Results will be benchmarked and published as a white paper for AEMO and DNSPs.”
Make it clear how the data will be captured, analysed, and shared. Knowledge sharing = higher score.
This is where you paint the bigger picture. Your pilot might target one zone — but show how the concept could be rolled out across the country.
Example:
“There are over 150 rural feeders with similar topology. If applied to 20% of them, we estimate this solution could unlock 800MW of additional renewable hosting capacity.”
This is where you outline a real plan — not just ambition. Talk about funding pathways, potential partners, and how the solution could be adopted beyond your pilot.
Example:
“Pending pilot success, we’ll apply for ARENA deployment support and engage the CEC to include this in their Network Innovation Hub. We’ve already opened discussions with two DNSPs about commercial implementation.”
The takeaway: show this is more than a pilot — it’s a stepping stone to system-wide change.
Grid enhancing technologies are tools or systems that improve the efficiency, capacity, or visibility of the existing electricity network. They help integrate more renewables without the need for new poles and wires.
Up to $5 million is available per project. The total funding pool is $100 million under Round 1, and matched co-funding is required.
Eligible projects include congestion forecasting tools, dynamic line rating systems, grid visibility sensors, DER integration platforms, and digital twins for substations. Greenfield builds are not eligible.
Australian-registered companies with a deployable grid-related solution. Research organisations and universities can be partners, but not lead applicants.
Competitive applications quantify grid-level outcomes (like MW unlocked or $ deferred), show strong partnerships, and demonstrate a clear pathway to scale and sector impact.